03/10: Current Weight: 64.8kg          24/09: Current Weight: 65kg          22/09: Scanned Ageha December 2006 and uploaded it          08/09: Scanned Blenda March 2013 and uploaded it     05/09: Current weight: 65.8kg           01/09: I added "random posts" back on left sidebar     29/08: Current weight: 66kg    28/08: Added a page with my html codes

2021年11月12日金曜日

2007 inspo post

 

Heyya Bunnies!

So I've decided to do a lil inspo post from 2007.
I have 6 magazines that are from that year. And I am going to pick a few things from each magazine for inspo, such as key items/codes etc.
Rose June 2007
Yes, hime gyaru was already a thing.
In the first issue from this magazine, there is hardly any pink girly content..however lots of glamour codes. If you want to see more of it click here.
Of course I am going to add Tsu-chan for the inspo post.
I want to keep this hair tutorial in mind. Its a ponytail on the side, but without a ponytail. I like the technique being used here.
Stylish sunglasses
Rose July 2007
Alright, this one has way more hime inspo...especially regarding la pafait and jesus diamante. But this time I want to keep an eye open for other substyles. Read more here.
Why did I overlook this bag??
Remember➡️brand names
Cute hairbands..
Popteen January 2007
I just realised this is the only popteen I own...might get some more. Read more here.
Three outfits with big waistbelts...thats a sign lol
Ageha february 2007
I am an ageha lover, so I am glad I had some from this year. See more here.
I am glad I found butterfly hairclips like these...I also have seen similiar necklaces.
Some reeally old sakurina inspo
Ageha september 2007
Early issues of ageha are all about hairstyles so I cant really scratch a lot inspo from these unfortunately. Read post.
Iconic sakurina look
Es Poshh! november 2007
This is by far one of my most favourite magazine I own. I look through it over and over again. I cant believe I didnt know this. I was looking for other issues but it seems impossible to get some. I was super lucky. Read here.

3 件のコメント:

  1. ldfnglknfg THE ROSE MAGS AAAAAH! *3*

    返信削除
  2. You always find a ton of magazines! I've never heard of Rose before.
    きーりん♡
    kiringalblog.com

    返信削除
    返信
    1. I found it when looking up ,,姫" in mercari. 💕

      削除